Mietobjekte

Cadolto > Hospital

Building Hospital with Cadolto

Germany is one of the most important international locations for medicine. Research, teaching, as well as clinical and rehabilitation units here enjoy an excellent reputation. This is not only due to the excellent academic training of our doctors, but, and above all, due to the high quality of our clinic buildings and medical infrastructure.

Due to this reputation and the associated increase in medical tourism from abroad in connection with an aging German society, the need for clinics and hospitals continues to increase. That is why flexible solutions are needed here, which are based on the treatment processes, in order to be able to react quickly to necessary changes through medical innovations. Modular construction from Cadolto offers the best options for this: requirements that have to be planned or implemented unexpectedly can be met flexibly and, above all, quickly. We manufacture building complexes for individual specialist departments or complete clinics regardless of the weather and with medical precision in our own factory with a degree of prefabrication of 90% and implement your construction project around 70% faster, cheaper, and more flexibly than with conventional construction. Without months of construction work and without with noise, dust, and vibrations. The biggest advantage: If the need for these buildings decreases again at some point, remodelling or even relocating the original buildings is no problem.

Faster achievement of goals

The biggest advantage of the modular design is its speed. On average, about 70% of the construction time can be saved.

Quality and safety

In terms of quality and safety, modular construction is in no way inferior to conventional. On the contrary: thanks to the high-quality standards, the proverbial “botched construction” is avoided.

Highest degree of prefabrication

In industrial building manufacture, Cadolto can show the highest degree of prefabrication – up to 90%. The more demanding a building and its building technology, the more interesting it is to install all of these components in advance.

Tremendous sustainability

While 70% of the buildings erected by Cadolto are still at their first location, 30% of the buildings are being used again elsewhere. The modules have a very long life-cycle and all building materials can be reused.

Marin Zec
Sales South / East + Austria
Phone: +49 151 24124070

MODULE CONSTRUCTION PRODUCTION

Modular construction

Our degree of prefabrication of up to 90% in the construction of hospital wards ensures that your clinic, patient care facility and hospital structure remain largely free of disruption as most of the building is built in the factory. Quality assurance is guaranteed while keeping the deadline for completion. Even in advance, we think far beyond the turnkey handover, the award, or the remuneration, in the healthcare sector. Remodelling? A new emergency room, intensive care unit or specialist department? Not enough capacity? A new MRI or operating room? Additional health buildings for your nursing home? Old diseases, new requirements?

Modular construction - Hospital

Yes- the modular construction from Cadolto faces no obstacles, even in the construction of Large-scale projects.

Thanks to a degree of prefabrication of up to 90%, Cadolto is able to cut the construction time in half.

When planning with Cadolto, there is only one thing to keep in mind: it will be finished a lot faster than you think. In terms of architecture, there are no limits to the modular design; for example, Cadolto has already built round houses.

The high-quality modular construction from Cadolto is a permanent solution. More than 70% of the buildings that we have constructed have been standing for over 30 years.

MODULAR CONSTRUCTION - REVOLUTIONIZING THE CONSTRUCTION OF TOMORROW.

You heard right. Noise, dust, emissions, bad weather, delays, craftsman chaos, inefficiency – are all things from yesterday. Strange that construction is done in this way even today. The future doesn’t exist yet. Our dreams and visions do. And the space for it. We have built our own way with joy and passion. Since 1890. With 300 employees and above all: with modules. And if everything changes tomorrow, we will dismantle it and move it somewhere else – exactly the flexibility that your company needs today for tomorrow. Because “tomorrow” is what you and we will make of it together: a modular building that will be finished before it is built. Future-oriented. Individual. Exclusive.

WE HAVE SAMPLE PLANS FOR ALMOST EVERY NEED.

How many square meters should a reception area have? Where are the offices, where are the meeting rooms? And what other areas are required? Not quite the everyday questions that concern you as the client and those to which our experts have the answers.

MODULE CONSTRUCTION PRODUCTION